Henan Industrial Equipment Cluster, China
Certifications: ISO9001 / CE / EPA Compliant
24/7 Global Response

Comprehensive Industrial Waste Recycling Lines

Strictly grounded in Henan Yushunxin's proprietary manufacturing standards, delivering full-cycle processing from single functional machinery to integrated multi-ton turnkey plants.

Crystalline Silicon PV Module Recycling Line
Solar Panel Recycling
ENV-PV-CS100

Crystalline Silicon PV Module Recycling Line

Integrated physical-mechanical and precision thermal delamination line for crystalline silicon solar panels, recovering ≥98% pure glass, aluminum, and copper.

Target Feedstock: End-of-Life Crystalline Silicon (c-Si) Single/Double Glass PV Modules (Width: 800-1,300 mm)
Processing Throughput: 1,000 - 3,000 kg/h (customizable up to 5,000 kg/h)
Clean Glass Yield: ≥ 95% - 98% (EVA/POE residue-free cullet, Purity ≥ 98%)
PV Manufacturing Scrap Recycling Line
Solar Panel Recycling
ENV-PV-MFG50

PV Manufacturing Scrap Recycling Line

Specialized continuous recovery system for factory off-cuts, defective cell laminates, trimming strips, and production floor scrap.

Target Feedstock: PV factory defective modules, edge-cut trims, rejected cell laminates
Processing Capacity: 500 - 2,000 kg/h continuous inline processing
Precious Metal Recovery: ≥ 96% silver and copper recovery rate
UBC Decoating Line
Aluminum Scrap Pretreatment
ENV-UBC-5000

UBC Decoating Line

Continuous rotary thermal delacquering kiln for Used Beverage Cans (UBC) with automated VOC recirculation and sub-0.5% metal oxidation loss.

Target Feedstock: Shredded Used Beverage Cans (UBC), baled or loose aluminum tins
Processing Capacity: 2.0 - 8.0 Metric Tons / Hour
Kiln Type: Indirectly/Directly heated continuous rotary kiln with internal flights
View All Solutions & Technical Specifications →

Strict Material Boundaries & High Output Purity

Henan Yushunxin enforces rigorous feedstock quality control to guarantee maximum recovery value, equipment longevity, and full environmental compliance.

TECHNICAL BOUNDARY RULE Feedstock Acceptance Criteria:

Permitted: Crystalline Silicon (c-Si) Photovoltaic Modules (Monocrystalline & Polycrystalline; Single-glass EVA and Double-glass POE); End-of-life solar farms, factory scrap laminates.
Strictly Prohibited: Thin-film modules (CdTe, CIGS, GaAs), Perovskite, Lithium batteries, bulk steel/concrete, and seawater-soaked modules (high chlorine accelerates dioxin formation).

Integrated 4-Stage Zero-Pollution Process

How Yushunxin machinery converts bulky decommissioned scrap into high-value commodities without hazardous air emissions.

Industrial Equipment Fabrication & EPC Delivery Standards

Explore Yushunxin's comprehensive manufacturing benchmarks: heavy-duty continuous workshops, pre-delivery trial testing, full-cycle EPC engineering, and global emission compliance.

YUSHUNXIN-ENV // EPC-OPERATIONAL-CONSOLE-v4.2
SYSTEM ACTIVE: ISO9001 / CE

End-to-End Plant Engineering & Turnkey Commissioning

We don't just ship standalone equipment. We provide total engineering responsibility including customized factory civil layouts, 3D piping blueprints, local voltage/frequency matching, DCS central control integration, and overseas engineer dispatch.

30-45 Days
Rapid EPC Manufacturing
Fast-track fabrication in our 25,000m² cluster
100%
Full Electrical Match
380V/480V/600V with Siemens/Schneider PLC
On-Site
Global Engineers Dispatch
Hands-on crew training & trial production
Full 3D CAD Equipment & Piping Layout Matching
Multi-Language DCS / SCADA Touchscreen Interface
ISO9001 / CE Export Declaration Document Package
Lifetime Spare Parts & Remote IoT Diagnostics
Request Turnkey Plant Configuration Proposal →

72-Hour Continuous Factory Test with Real Feedstock

Every continuous pyrolysis kiln, glass peeler, and decoating reactor undergoes 72 hours of uninterrupted dry-run and live material load testing before packing. Customers receive high-definition video logs, temperature vibration graphs, and third-party laboratory recovery assays.

72 Hours
Continuous Factory Trial
Zero-stop stress testing under operating load
0 Vibration
Dynamic Laser Balancing
Heavy rotating drums verified under 0.05mm
HD Video
Full FAT Digital Dossier
Complete factory acceptance data package
Live Material Trial Inspection via Video Conference
Ultrasonic Weld Flaw Detection (UT/RT Certified)
310S / 2520 High-Temp Alloy Thermal Stress Certs
Electrical Circuit Megger & Dielectric Proof Tests
Schedule Workshop Live Stream or Visit →

Multi-Stage Flue Gas Scrubbing & Dioxin Suppression

Thermal recycling projects must pass strict environmental permits. Our closed-loop system pairs a 1-second rapid quench tower (cooling from 500°C to <200°C to prevent dioxin synthesis) with activated carbon adsorption, pulse baghouse filters, and catalytic oxidation to comply with EU & US EPA standards.

< 0.1
ng-TEQ/m³ Dioxins
Surpasses European standard limits
< 10 mg/m³
Particulate Emission
High-efficiency PTFE membrane filtration
Zero
Industrial Wastewater
Closed neutralization scrubber circulation
1-Second Thermal Quench Tower (Bypasses 250-400°C Window)
Heavy Pyrogas Re-injection as Fuel Source (Zero Waste)
Continuous CEMS Online Flue Gas Monitoring Ready
Guaranteed Local Environmental Permit Approval
Request Emission Report & Scrubbing Flowsheet →

End-Product Monetization & Verified International Off-Takers

Profitability depends on selling your recycled outputs at top market pricing. Yushunxin connects turnkey plant operators directly with certified global buyers for commercial-grade silver ingots, metallurgical silicon powder, clean glass cullet, and battery-grade black mass.

≥ 99%
Silver Ingot Purity
Commercial trading grade for precious smelters
≥ 98%
Cullet Glass Purity
Accepted by high-grade container glass factories
Global
Smelter Network
Direct off-take contract matching assistance
Pre-Agreed Product Quality Standards & Packaging Specs
Real-Time LME / Shanghai Metal Exchange Pricing Reference
Tailored Project Financial ROI Modeling (Typically 8-14 Mo)
Certified Product Sampling & Third-Party Assaying Protocols
Download Project Economic ROI & Off-take Guide →

Equipment In Action: Live Operational Footage

Inspect actual workshop testing, continuous pyrolysis reaction, hydrometallurgical silver extraction, and customer plant installations.

Client Site Live Run

Turnkey Plant Client Commissioning

Continuous material intake and closed-loop process monitoring at our customer's industrial recycling site.

Thermal Pyrolysis & Silver

Thermal Delamination & Silver Recovery

Oxygen-free thermal cracking of EVA/POE polymers followed by electrostatic sieving and wet silver precipitation.

Core Unit Test

Automatic Frame Disassembly Station

Hydraulic stripping of 4-sided aluminum alloy borders in 30 seconds without damaging the tempered glass surface.

Global Project Reference Installations

Our recycling equipment and thermal pyrolysis units operate reliably across various geographical and regulatory jurisdictions worldwide.

Central Europe 20,000 Ton/Year PV Recycling Plant
Germany / Central Europe

20,000 Tons/Year Solar Panel Continuous Pyrolysis Project

Feedstock: c-Si Mono & Double Glass
Equipment: Continuous Tunnel Furnace
Throughput: 5,000 kg/h
Key Output: Silver (99.2%) & Pure Si

Compliant with EU WEEE Directive and stringent TA-Luft emission norms, recovering over 120 kg of pure silver annually.

Southeast Asia 10,000 Ton/Year Battery Recycling Plant
Vietnam / Southeast Asia

Turnkey Lithium Battery Whole Physical Sorting Line

Feedstock: NCM & LFP Cell Scrap
Equipment: ENV-LIB-1000 Line
Throughput: 1,000 kg/h
Key Output: Black Mass (≥98% Purity)

Integrated nitrogen inerting and dry separation system yielding clean copper/aluminum granulates and high-grade battery black powder.

Middle East Aluminum Decoating Installation
UAE / Middle East

UBC Aluminum Can Scrap Continuous Decoating Furnace

Feedstock: Used Beverage Cans (UBC)
Equipment: ENV-DL-3000 Decoating Line
Throughput: 15 Tons / Day
Key Output: Clean Delacquered Aluminum

Reduces smelting melt loss by over 80% while recirculating volatilized paint off-gas to achieve self-sustaining thermal operation.

Request Turnkey Proposal & Cost Estimate

Share your feedstock specifications and expected capacity. Our senior engineers will draft a tailored technical proposal and ROI model within 12 hours.

Global Quick Quotation Form
Strict NDA Guarantee: Your contact and commercial specifications are strictly protected and never shared.

Frequently Asked Technical Questions

Essential clarifications on processing capacities, emission controls, recovery rates, and turnkey delivery.

Our standard mechanical and thermal solar panel recycling lines operate at 1 ton/hour (1,000 kg/h). Based on 20 operating hours per day, a single line processes approximately 20 tons daily (500-600 tons/month). We also customize large continuous tunnel furnace installations handling 30 to 100 tons per day for utility-scale recycling projects.
We provide two distinct process pathways: 1) Physical Mechanical Sorting utilizes automated frame stripping, multi-stage crushing, and electrostatic separation to produce clean glass (≥98%), aluminum frames, and coarse silicon without chemicals. 2) Continuous Oxygen-Free Tunnel Pyrolysis (550-650°C) operates under a low-oxygen inert atmosphere (O₂ ≤ 4%) to completely gasify EVA/POE encapsulant films within 15-20 minutes, liberating intact wafers for precious silver recovery (≥95%) and yielding pure silicon with recovery rates up to 98%.
Thin-film modules (CdTe, CIGS) contain heavy toxic metals (cadmium, tellurium, gallium) that would permanently contaminate your recovered silicon and glass, creating severe hazardous waste liabilities. Our machinery is exclusively engineered for crystalline silicon (c-Si) single-glass and double-glass panels.
Our thermal off-gas system employs an integrated purification train: 1) Thermal Oxidizer (TO furnace) operating at ≥850°C with residence time ≥2 seconds for complete VOC and dioxin thermal destruction; 2) High-speed quench tower crashing flue gas from >400°C to below 200°C within 1 second (bypassing the 400-250°C dioxin resynthesis window); 3) Dual alkali scrubbers for HF acid removal; 4) Activated carbon adsorption and pulse-jet baghouse filtration. Dioxin emissions are strictly controlled under 0.1 ng-TEQ/m³, fully compliant with EU and EPA standards.
For our standard 1 ton/h line processing 20 tons daily, the comprehensive market value of recovered materials (clean glass, aluminum frames, silicon powder, copper, and precious silver) typically reaches $550 - $850 USD per ton of scrap modules. Factoring in energy, labor, and depreciation, static investment recovery is achieved within 1.5 to 2.5 years.